Tender release
Before drawings and BOQ go to bidders.
Electrical design review for drawings, calculations, protection coordination, grounding, specifications, and procurement decisions under Kazakhstan project requirements and project-defined IEC references.
Use it when an electrical package needs an employer-side check before money, time, or site sequence is committed.
Before drawings and BOQ go to bidders.
Before equipment, panels, or cable packages are approved.
When designer, supplier, and site assumptions do not align.
The review focuses on decision-critical evidence, not explaining every electrical term.
Source, panel, load, redundancy, and capacity assumptions.
Protection intent, selectivity risk, earthing and bonding approach.
Drawings, BOQ, datasheets, and specifications telling the same story.
The output is short: approve, revise, hold, or investigate with the reason attached.
Traceable comments against drawing or document references.
Items that may affect safety, cost, procurement, or approval.
What can proceed and what must change first.
Send the design package. Peritus supports the employer decision; it does not replace the responsible designer, authority approval, or required testing.