Before procurement
Check that drawings, calculations, specifications, and BOQ logic are ready to price.
Independent electrical engineering judgment before design, procurement, or site decisions become expensive to reverse.
Use this discipline when the employer needs a defensible technical position, not another long report.
Check that drawings, calculations, specifications, and BOQ logic are ready to price.
Find coordination, grounding, protection, and documentation gaps before they become site changes.
Separate necessary change from preference, supplier pressure, or avoidable complexity.
These modules test design assumptions, asset condition, and optimization options before procurement, site work, or investment decisions are locked.
Electrical design review for drawings, calculations, protection coordination, grounding, specifications, and procurement-safe technical decisions under Kazakhstan code and project IEC expectations.
02Asset, compliance, capacity, maintainability, and lifecycle review before acquisition, lease, redesign, or investment decisions in Kazakhstan.
03Optimization of existing or proposed electrical systems to reduce unnecessary capacity, complexity, energy losses, maintenance burden, and lifecycle cost.
Peritus keeps the output decision-ready: what is acceptable, what needs action, and what should not proceed yet.
Approve, revise, hold, or investigate.
Issues ranked by impact and urgency.
Who needs to do what before the next gate.
Submit the first technical package and we will return a scoped review protocol.